Water Main Flushing to Begin April 15
RIVERVIEW (N.B.) - The Town of Riverview wishes to advise the public that water main flushing will be carried out beginning April 15, from 8 a.m. to 8 p.m. Monday to Friday.
The flushing is required to maintain satisfactory water quality throughout the Town’s distribution system. This routine maintenance typically takes about four weeks.
Please note that there may be water discoloration during flushing operations. Any discoloration is temporary and should clear within a short time. Users are asked to minimize consumption if a change in water appearance is noticed.
Those with questions about the flushing operation can contact the Town’s Department of Engineering and Public Works at 387-2030.
The Town of Riverview apologizes for any inconvenience this work may cause. Your cooperation and understanding are appreciated.